女人下边被添全过视频的网址,麻豆网站少妇AAA片,亚洲精品 无码一区二区三区 ,少妇人妻无套进入69va
Hello, Welcome to Jinan Fast CNC Machinery Co.,Ltd!

CONTACT INFO

JINAN FAST CNC MACHINERY CO., LTD


WhatsApp:086-15098878331

Mobile: 086-15098878331 

E-mail: chelsea@fastechcnc.com

              lfqft@163.com

Fax:086-0531-87459135

Add: No 8521 WEST JIGSHI ROAD, JINAN.CHINA

Zip:250300



CNC drilling and milling machine to buy the use of special attention

Source: Time:2017-06-24 13:41:00 views:

For CNC drilling and milling machine, the operation of what matters? CNC milling machine manufacturers to introduce you to you.

For CNC drilling and milling machine, the operation of what matters? CNC milling machine manufacturers to introduce you to you.

First of all, before running a small CNC drilling machine, it is necessary to wipe the dust exposed on the guide rail surface and the sliding surface of the cover and lubricate various parts according to the regulations of a small CNC drilling machine, and check the positions of the handles. After the small CNC drilling empty test run, if there is no problem, you can start working.

After the CNC drilling and milling machine stops working, it is necessary to clean all the small CNC drilling irons and wipers clean the parts of the cover, and the parts should be put in place. For small CNC drilling machine headstock to be in place, check the oil to maintain good. Other parts of the cleaning, lubrication.

Above is the operation of small CNC drilling Notes on the relevant introduction, I hope we have some understanding, do not just focus on their work efficiency, to know the small CNC drilling efficiency reflects the need for many aspects of the combination, such as the operation flow, the following small For everyone to explain the next series.

                                                     
CNC drilling and milling the correct operation of the process:
1. Carefully check the grid voltage, pump, smooth, oil is not normal before work, check the pressure, cooling, tubing, tools, fixtures are not missing, and make small CNC drilling timed maintenance operations.
2. CNC drilling and milling machine powered on, the first mechanical back to zero operation, and then commissioning five minutes, admitting machinery, cutting tools, fixtures, workpieces, CNC parameters, etc. is correct, can start small CNC drilling machine normal operation.
3. Active cycle processing, should be closed protective sliding door, rotating the spindle at the same time requiring manual operation, we must make their own body and clothing away from the rotating and moving parts, to avoid the clothing into the incident involved.
4. When clamping the workpiece clamping, to avoid the workpiece flying out of the formation of the incident, the end of the clamp, pay attention to the chuck wrench and other things to remove the adjustment to avoid the spindle spin thrown out after the incident.
5. Spindle or turret knife tooling operation must be stopped in the state of mechanical movement, and pay attention to collaboration and collaboration between staff to avoid small CNC drilling machine showing trouble. In the manual tool change or active tool change, pay attention to the turret, tool changer, robot arm and tool orientation changes, body and head away from the tool reversing parts to avoid bumps. CNC machining center drilling and milling machine, should also pay attention to view the corresponding tool between the magazine tooling number and the corresponding link to avoid the formation of tool changer knife disorder or change the knives incident.
6. Carefully check the programming, parameter setting, action sorting, tooling and, workpiece clamping, switch maintenance and other aspects is not completely correct, to avoid the formation of small CNC drilling cycle processing issues, damage to tools and related components. Strictly according to the operation flow of the trial cutting knife, commissioning of small CNC drilling machine to do a good job after the completion of the program maintenance.
7. CNC drilling and milling machine operators should be able to handle the general alarm problems, if serious problems, should be quick power, and maintain the scene, timely reporting, and make records.
8. After the end of the bed operation, should be small CNC drill rail, workbench wipe clean, and carefully fill in the small CNC drilling machine log.

keys: 
Links
       
MOBILE STATION SCAN

     WeChat SCAN
TEL:086-15098878331   FAX:086-0531-87459135   Mobile:086-15098878331
ZIP:250300    Email:chelsea@fastechcnc.com
ADD:NO 8521 WEST JINGSHI ROAD JINAN,CHINA
Copyright© Jinan Fast CNC Machinery Co., Ltd
嫩BBB槡BBBB槡BBBB日本 | 国产精品久久久久久久久久久久 | 国产做爰XXXⅩ6699 | 真实的国产乱ⅩXXX实拍 | 亚洲AV综合AV一区二区三区 | 无码人妻丰满熟妇啪啪无 | 国产成人性爱视频 | 国产做爰XXXⅩ高潮网站预告片 | 国产高清在线观看 | 黄色视频免费链接 | 安徽妇搡BBBB搡BBBB小说 | 色情午夜 码一区二区 | 蜜桃AV鲁一鲁一鲁一鲁 | 果冻传媒婬片AAAA片小说直播 | 国产精品右手视频 | 波多野结衣乳巨码无在线观看迅雷下载 | 亚洲乱色熟女一区二区三区 | 日韩一级黄色电影 | 精品久久久久久无码一区二区 | 国产成人精品人妻无码 | 国产成人一区二区福利视频 | 绿帽人妻白浆真实视频 | 国产一区二区三区视频网站 | 国产精品国产三级国产普通话三级 | 欧美日韩中文字幕无码 | 中文无码日本一级毛片免费 | 成人A片产无码免费视频奶头麻豆 | 亚洲美女性爱视频 | 乱子伦国语真实视频 | 色情午夜 码一区二区 | 黃色A片三級三級三級免费看宝贝 | 国产一区二区三区网站 | 亚洲无码av一区二区 | 国产精品二区一区二区AⅤ污介绍 | 少妇一级婬片免费放 | 国产又粗又猛又爽又黄无码的视频 | 久久精品一区二区三区免费 | 午夜精品久久久久久久久久久久 | 少妇搡BBBB搡BBB搡打电话 | 无码人妻丰满孰妇区 | 亚洲精品高清无码 |